PROJECT ISSUED: 11.00AM - 9/12/2013 (MONDAY)
PREPARATION PERIOD: 11.00AM (9/12/2013- 20/12/2013) 6.00PM ( 11 DAYS)
THE NIGHT
DATE: 20TH DECEMBER 2013 ( FRIDAY)
TIME: 7.30PM-11.45PM
VENUE: DEWAN KULIAH D USM
THEME: THE LOST KINGDOM
Project 8 is the last project for our studio RUS104. For this project we need to dress up according to the Lost Kingdom that are given to us. Building technology student need to dress ''MATARAM" on the performance night. We also need to prepare some performance for that night. So for the performance Building Technology has choose to do two dance that combined traditional Malay dance using Nirmala Song by Dato Siti Nurhaliza and Africa dance using Waka-waka song. We had practice our dance at the Dewan Utama Pelajar. For the dance i joined in Waka-waka dance with the other 7 members. For the first time practice i feel very shame but after going for another training I feel so enjoy to dancing with them. The idea to do Waka-waka dance is come from Ze Tong.
For the dressing i don't know to wear what at first because we need to dress according the kingdom. Finally i choose to wear Kebarung and Batik for that night because MATARAM actually wear the Batik only.
On the performance day , 7 Kingdom are wear a great costumes according to their Kingdom. It is very nice and great event for me in my semester 1 as HBP student.
On the night, they have an awards for the activity that has been conducted from the first week until the last week of RUS104. Dinner are also been prepared on that night. The food are so delicious and last word I very satisfied for that night event.
there are some picture on that night: